3M™ Model 711 Digital Conversion Station
Quick Start Guide
16
©3M June 2000
5.
Install the roll of D1 tags onto the supply roll shaft, with the leader coming from the left side
of the roll (
Figure 19
).
Figure 19: Leader Coming Off Left Side, Threading Leader Up Under Curved Spring Plate
6. Thread the leader of the D1 roll of tags up through the tag feed area (under the curved steel
spring plate) (
Figure 19
).
7. The leading edge of the leader should come up through the top of the Conversion Station
(
Figure 20
).
Figure 20: Threading the Leader Up Through Tag Feed Area
5.
7.
6.