![background image](http://html1.mh-extra.com/html/3m/charge-analyzer-711/charge-analyzer-711_quick-start-manual_3158023015.webp)
Quick Start Guide
3M™ Model 711 Digital Conversion Station
©3M June 2000
15
2. Rotate the supply roll shaft until the stop lever is in the
UP
position (
Figure 16
).
Figure 16: Rotating Supply Shaft Stop Lever To Up Position
3. Release the stop lever so that it drops down into a horizontal (straight out) position (
Figure
17
).
4. Remove the two plastic core inserts from the supply roll shaft (
Figure 17
).
Figure 17: Releasing Stop Lever into Horizontal Position
a) Install the core inserts on each end of the D1 roll (
Figure 18
).
b) Remove tape from D1 roll.
Figure 18: Installing Plastic Core Inserts on Ends of D1 Roll
2.
3.
4.
a)
b)