5.2 Stake mount application
a. Carefully remove earth from around cables
to establish their location
b. Open doors on cabinet assembly
c. Remove block frame
d. Remove bottom front access panel
e. Remove bottom frame support
f. Fill excavation with washed gravel to within
4" of top of bottom bracket
g. Place cabinet over cables in a vertical
position with cabinet centered over cables
h. Place anchor stakes on each side
i. Place a wooden block on top of stake
j. Using a sledge hammer, drive stake until
both bolt holes line up
k. Secure anchor stakes to the sides of the
cabinet with bolts provided
l. Fill cabinet base with washed gravel to
within 4" of top of skirt
5.3 Pole mount application
1. Follow your company practice on attaching
‘pole mount hardware’
2. Attach the pole bracket at 60" above the
ground line
3. Attach the top and bottom mounting
brackets on the back of the cabinet
a. Make sure both brackets are aligned and
plumb with the cabinet
4. Hang the cabinet on the bracket
attached to pole
a. The top cabinet brackets support the
cabinet’s weight
5. Secure bottom cabinet bracket to the
pole with a lag bolt
3M
™
Top Pole Mount Bracket 4295 B,C,D
3M
™
Pole-mount Hanger Brackets installed on the back
of a 3M
™
Cross-Connect Cabinet 4220VB or 4220VC
6
78-0013-7947-4-A
September 2015