
q u i c k s t a r t g u i d e
r d m r e m o v a l
36
Moving The Recoater and Elevator to Start Positions
Figure 11. Manual Move Operations Screen
Platform Installation (possible software included in this stage)—
picture included?
The RDM must be in the machine before this process starts. When correctly installed, the
platform sits on the elevator platform mount.
1 Make sure that the elevator motion stage is at its highest setting.
Содержание Viper Pro SLA iPro 8000
Страница 2: ...q u i c k s t a r t g u i d e 2 Customer Support 78 Legal Notices 79 ...
Страница 12: ...q u i c k s t a r t g u i d e q u i c k s y s t e m o v e r v i e w 12 ...
Страница 13: ...q u i c k s t a r t g u i d e q u i c k s y s t e m o v e r v i e w 13 ...
Страница 14: ...q u i c k s t a r t g u i d e q u i c k s y s t e m o v e r v i e w 14 ...
Страница 27: ...q u i c k s t a r t g u i d e r d m i n s t a l l a t i o n a n d r e m o v a l 27 Figure 7 Container Lifted ...