Introduction
4
Powerware
®
Prestige Series Installation and Operator’s Manual for IBM Applications (3000 VA)
Uncontrolled Copy
1.
See “Load Requirements” on page 2 for assistance in
determining the total load requirements for your UPS. Round
this number up to the next Load (VA) entry in the following
table, “Prestige 3000 with PPDM,” and enter the number in
Figure 3.
2.
In Figure 3, enter the number of battery cabinets that you
have installed. Find the intersection point of the appropriate
Load (VA) and number of battery cabinets in the following
table, “Prestige 3000 with PPDM.” Enter this number in
Figure 3, Total Battery Time Minutes.
If changes take place in your installation, such as different load
parameters or changes to battery cabinet configuration, take time to
reevaluate your approximate battery time availability.
NOTE
For detailed information regarding calculation of 9910 UPS battery capacity and
run time for your load, reference: “AS/400 Physical Planning,” SA41-5109, “AS/400
Advanced Series Backup and Recovery - Advanced,” SC41-4305 (see Chapter 10), or
“AS/400e series Backup and Recovery,” SC41-5304 (see Chapter 37).
Prestige 3000 with PPDM
Load (VA)
Load (W)
Approximate Battery Time (in Minutes)
Load (VA)
Load (W)
1 Cabinet
2 Cabinets
3 Cabinets
600
420
36.8
88
146
800
533
27.6
66
110
1200
800
18.4
44
73
1600
1067
13.7
33
54
2000
1333
10.7
26
42
2500
1667
8.3
20
33
3000
2000
6.5
16
27
NOTE
For AS/400 usage, see “Base Equipment” on page 69.