
VES-1012 Hardware Installation Guide
Hardware Installation
2-1
This chapter shows you how to install hardware for a free-standing or rack-mounted scenario.
2.1 Operating
Environment
The following is the recommended environment for the VES-1012.
Operating Environment
•
Temperature: -5ºC — 60ºC
•
Humidity: 5% — 95%
Storage Environment
•
Temperature: -40ºC — 70ºC
•
Humidity: 20% — 95%
Refer also to the
Hardware Specification
Appendix
.
2.2
Free-standing VES-1012 Installation Requirements
Position the VES-1012 on a flat surface. Remember that the unit requires proper ventilation.
2.3
Rack-mounted VES-1012 Installation Requirements
•
Two mounting brackets (supplied).
•
Eight M3 flat head screws (supplied) and a #2 Philips screwdriver.
•
Four M5 flat head screws and a #2 Philips screwdriver.
2.4
Mounting the VES-1012 on a Rack
Precautions:
•
Make sure the rack will safely support the combined weight of all the equipment it contains.
•
Make sure the position of the VES-1012 does not make the rack unstable or top-heavy. Take all
necessary precautions to anchor the rack securely before installing the unit.
Chapter 2
Hardware Installation
Summary of Contents for VES-1012 -
Page 1: ...VES 1012 VDSL Ethernet Switch January 2002 Version 3 30 Hardware Installation Guide...
Page 10: ......
Page 18: ......
Page 26: ......
Page 44: ......