The first 4 springs should be attached to the frame from 12
o’clock then next to 3, 6, 9 o’clock (
VERY IMPORTANT
). Drop
the hook into the frame hole until it latches on completely
and tap it down if the hook is not completely in the hole.
Then the next 4 springs should be right in the middle of every
two springs which have been installed.
Note:
Always install
the spring in the opposite position to make the tension of
springs averagely distribute after one spring is attached, or
you'll find it's getting harder to attach the springs, even
unable to attach it in the end.
Similarly, the next 8 springs should be in the middle of every
two springs that have been installed. If you notice that you
have skipped a hole and V-ring connection, recount and
remove or attach any spring required to maintain the count
of springs.
Attach the remaining springs until all the spring are placed on
the frame and secured firmly.