10
To connect the parts, simply slide a section (male) tubing that
is smaller on one end into the adjacent section (female) that
has a larger opening. These joints are called “connector
points”.
Let's start from here. Put the slip-resistant parts (#16) onto
the two sides of the Leg Base (#5).
(a) Two people are required to assemble the trampoline. One lifts the Support Assembly from Step 2 to a standing (vertical) position
and inserts one of the sockets of the Top Rail with Sockets (#3) into the Vertical Leg Extension portion of the Support Assembly;
the other holds the opposite end and inserts that portion into the other Support Assembly as shown. Now you should have two
Support Assemblies held together by one Top Rail with the Socket.
Slide all Vertical Leg Extensions (#6) onto the Leg Base (#5) as
shown.
STEP 2 - SUPPORT ASSEMBLY
STEP 3 - FRAME ASSEMBLY
5
16
5
6
3
3
3
4
5
6
Summary of Contents for Saffun Trampoline
Page 31: ......
Page 32: ...PLAY ENJOY BOND ...