6
、
COOLING SYSTEM COMPONENT
61
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1274200-274021 ZT310
-
V main water tank
1
2
1244100-002000 ZT250
-
S Side cover round rubber
4
3
1274200-091000 ZT310 water pipe clamp
(
φ27
)
1
4
1274200-089000 ZT310 water pipe clamp
(
φ22
)
2
5
1244200-113000 ZT310-V small circulation water pipe
1
6
1244200-071000 ZT310-V engine outlet water pipe
1
Fig.10 COOLING
SYSTEM COMPONENT
Main water tank assembly 2
PROCEDURE:
●
Main tank assembly
Remove 4 pieces of side cover round glue
⑵
from the main water tank
⑴
.
After wearing the waterproof gloves, clamp the hoop with pliers
⑷
and remove the hoop after removing the
anti-slip boss.
Remove the small circulation water pipe
⑸
or
⑺
and take off the two hoops
⑷
.
Remove the outlet pipe
⑹
and the hoop
⑶
as previously described.
CAUTION:
●
Cooling liquid is toxic. Avoid strictly eye or skin contact.
●
Do not disassemble the hoop with too strong force. If not, it will cause permanent deformation and lose
elasticity, which will lead to leakage of cooling liquid.