© Copyright 2020 Zoeller Co. All rights reserved.
- 6 -
STEP 3
ROUGH-IN
1)
Position the pump unit a minimum of
(3 mm)
1/8"
from the wall
with the inlet facing away from the wall. Attach the bellows to the
inlet using the worm drive clamp provided.
2)
Place the toilet in front of pump unit aligning the discharge of the
toilet with the inlet of the pump unit. Make sure that the bellows
will bridge the gap adequately for
installation. The toilet
tank should be a minimum of
(13 mm)
1/2"
from
the
wall.
3)
Lightly mark the locations of the pump unit, toilet and closet
bolt locations on the
Lightly mark the wall with the height
of the pump unit and the
bottom and sides of the toilet tank to
ensure against interference from pipe runs later.
4)
Remove the toilet from the pump unit and set it aside.
(STAND-ALONE INSTALLATION)
(BEHIND THE WALL INSTALLATION)
1)
Installing the pump unit
behind
a wall will require an
extension kit (P/N 10-2123) sold separately.
2)
Place the toilet assembly a minimum of (13 mm)
1/2"
from
the wall and mark the closet bolt locations on the floor.
3)
Measure the appropriate length of
3-1/2" Schedule
PVC
40
pipe provided with the extension kit and cut it to
length. See sketch below.
4)
Set toilet aside.
Toilet assembly is top heavy. Take special
precautions to ensure that toilet does not tip over and break.
Connect the rear discharge toilet to the front inlet of the Qwik Jon®
Premier via hose clamps. Ensure the connec�ons are
according to local, regional, and state codes.