background image

if local code allows it.)

PIPING

  STEP 4 

 

  2) 

While

  1)

 

 the discharge pipe, position and mark the location of

the pump unit discharge

  3) 

Cut and

1-1/2" (DN40) vent pipe as required to ensure that

the

pipe does not interfere with other components. Make the

connection to the pump unit with the provided street elbow.

A 2" x 1" 90° discharge

has been provided.

 

 

Proper venting is required. 

 

   

   

   4) 

Temporarily set the toilet in place to check that there is no piping

interference. Remove the toilet and set it aside.

 

5) 

Clean, prime and solvent weld the discharge piping and pump unit 

discharge 

 

 When applying solvent weld to discharge

 ensure that

none gets into the check valve assembly. Pay close attention to the proper

alignment of the discharge 

 previously marked.

  6)

For markets requiring a pipe vent, clean and solvent weld the vent piping

as required for proper venting.  

 

Cut and

the pipe and

as required for 1" (DN25)

diameter discharge pipe (may be reduced to 3/4" [DN20] diameter

 

Once the side inlet opening has been drilled out, remove burrs 

dry-fit

fittings

dry-fitting

dry-fit

fitting.

fitting

vent 

 and rough edges to avoid the potential for clogging. 

© Copyright 2020 Zoeller Co. All rights reserved.

-  7  - 

Note: 

Adding other bathroom fixtures - The Qwik Jon® Premier is designed to 

accept additional bathroom fixtures utilizing the two side inlets. These inlets can be 

attached via the 2" NPT (outside diameter) or the 1-1/2" (DN40) slip (inside diameter). 

These inlets must have the inner portion drilled out using a 1-3/4" (44 mm) hole saw. 

This is to ensure there is no leakage problems from inlets not in use. When utilizing 

side inlets, install a check valve on the incoming line.

Summary of Contents for QWIK JON PREMIER 201

Page 1: ...of this appliance is not intended for persons including children with reduced physical sensory or mental capabilities or lack of experience or knowledge unless they have been given supervision or ins...

Page 2: ...IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE AND OF MERCHANTABILITY SHALL BE LIMITED TO THE DURATION OF THE EXPRESSED WARRANTY Some jurisdictions do not allow limitations on the duration of an...

Page 3: ...with all applicable governing codes Option hose with clamp Item Description 1 Qwik Jon Preimer Sewage Removal System 201 0006 2 Outlet Pipe Assembly Repair Kit 084993 3 Tank Cover Repair Kit 084994 4...

Page 4: ...aterial to pump intake Hold flush handle down on toilet for 15 seconds If unit will not clear unplug and wait for 30 minutes Plug unit back in and repeat If unit still will not turn off it will need t...

Page 5: ...the pump Vent Access to a vent pipe is required in some markets The use of a mechanical vent system is NOT recommended as the toilet will not NOTE If a built in installation is to be used locate the p...

Page 6: ...the bottom and sides of the toilet tank to ensure against interference from pipe runs later 4 Remove the toilet from the pump unit and set it aside STAND ALONE INSTALLATION BEHIND THE WALL INSTALLATI...

Page 7: ...rge previously marked 6 For markets requiring a pipe vent clean and solvent weld the vent piping as required for proper venting Cut and the pipe and as required for 1 DN25 diameter discharge pipe may...

Page 8: ...pipe to the top of the Qwik Jon Premier Copyright 2020 Zoeller Co All rights reserved 8 Connect the desired inlet pipe from other xtures to the side inlet s of the Qwik Jon Premier Use a 1 3 4 44 mm h...

Page 9: ...POWER STEP 5 Connect all inlet piping to the Qwik Jon Premier if desired Plug the power cord into a wall socket to provide power to the unit Copyright 2020 Zoeller Co All rights reserved 9...

Page 10: ...d 10 1 1 2 stack vent Remove the stack vent pipe and discharge pipe from the top of the Qwik Jon Premier Mechanical and Electrical Hazard Disconnectpowerprior to maintenance or opening Thisequipmentis...

Page 11: ...Copyright 2020 Zoeller Co All rights reserved 11 Take o the lid of the Qwik Jon Premier Li the switch housing and pump out of the tank...

Page 12: ...0 Zoeller Co All rights reserved 12 The oat sleeve can be removed from the switch housing to clear the oat of debris The discharge elbow pipe can be disconnected from the volute of the pump to be clea...

Page 13: ...5 pipe max 368 112 m 3 4 DN20 pipe max 253 77 m 1 DN25 pipe max 483 147 m 3 4 DN20 pipe max 333 101 m 1 DN25 pipe max 597 182 m 3 4 DN20 pipe max 413 126 m 1 DN25 pipe max 769 234 m 3 4 DN20 pipe max...

Page 14: ...isolantes et ne pas se tenir dans l eau Certains types de prises peuvent comporter une fiche trois broches avec mise la terre pour aider prot ger contre les d charges lectriques Une prise de courant o...

Page 15: ...stall utilis ou entretenu conform ment aux instructions d installation du fabricant qui aurait t expos des substances ext rieures dont sans s y limiter les suivantes sable gravier ciment boue goudron...

Page 16: ...us es Qwik Jon Premier 201 0006 2 Trousse de r paration de l assemblage du tuyau de sortie 084993 3 Trousse de r paration du couvercle de r servoir 084994 4 Trousse de r paration du bo tier d interru...

Page 17: ...ue La pompe a un blocage d air S assurer que le trou d vent dans le tuyau d vacuation est d gag Soul vement vertical trop lev Changer la tuyauterie de l vacuation ou contacter le service du soutien te...

Page 18: ...courant de la tension appropri e est n cessaire pour alimenter la pompe en lectricit Eaux us es L acc s une canalisation d gout est obligatoire Le syst me Qwik Jon Premier n cessite un tuyau d vacuati...

Page 19: ...unit de pompage en alignant le tuyau d vacuation de la toilette avec l orifice d entr e de l unit de pompage S assurer que le soufflet comble l cart de mani re ad quate pour l installation Le r servoi...

Page 20: ...essitant un vent nettoyer et souder au solvant la tuyauterie d vent comme il se doit pour assurer une bonne ventilation Lors de l application de la soudure au solvant pour la conduite d vacuation s as...

Page 21: ...wik Jon Premier 8 Raccorder le tuyau d entr e provenant d un autre appareil sanitaire l entr e lat rale ou aux entr es lat rales du syst me Qwik Jon Premier U lisez une scie cloche 1 3 4 44 mm pour pe...

Page 22: ...TION Connectez tous les tuyaux d entr e au Qwik Jon Premier si vous le souhaitez Brancher le cordon d alimenta on dans une prise murale pour alimenter l appareil 9 Zoeller Co 2020 Tous droits r serv s...

Page 23: ...proc der l entre en ou l ouverture Cet quipement ne doit tre r par et entretenu que par un professionnel quali Re rez le tuyau d vent de chemin e et le tuyau d vacua on du haut du Qwik Jon Premier Zoe...

Page 24: ...11 Re rez le couvercle du Qwik Jon Premier Soulevez le bo er de l interrupteur et la pompe hors du r servoir Zoeller Co 2020 Tous droits r serv s...

Page 25: ...eur peut tre re r du bo er de l interrupteur pour d gager le o eur des d bris Le tuyau coud de refoulement peut tre d connect de la volute de la pompe pour tre d barrass des d bris Zoeller Co 2020 To...

Page 26: ...po max 126 m 413 pi Tuyau de 2 cm 1 po max 234 m 769 pi Tuyau de 1 9 cm po max 162 m 534 pi TAPE 7 T TE D BIT DYNAMIQUE TOTAL Mod le M tres Pieds Litres Gallons Zoeller Co 2020 Tous droits r serv s T...

Page 27: ...podr an presentar un riesgo de seguridad si el aislamiento se da ara o el extremo de la conexi n cayera en un rea h meda o mojada Aseg rese de que el circuito de suministro el ctrico de la bomba est...

Page 28: ...ra No se har ning n descuento a los cargos de env o da os mano de obra ni a los dem s gastos que puedan surgir debido al fallo del producto su reparaci n o reemplazo Esta garant a no se aplica y no ha...

Page 29: ...lir con todos los c digos vigentes aplicables Opci n manguera con abrazadera techo de pie techo de pie Subsuelo m nimo grueso vigas de piso Componente Descripci n 1 Qwik Jon Preimer Sewage Removal Sys...

Page 30: ...de la bomba Mantenga hacia abajo la palanca del tanque del inodoro durante 15 segundos Si la unidad no se limpia desen chufe y espere 30 minutos Enchufe nuevamente la unidad y repita Si la unidad toda...

Page 31: ...mm Si el piso no est nivelado utilice cemento hidr ulico o un material similar para nivelarlo Agua se necesitar un suministro de agua para que funcione el inodoro Por lo general es suficiente una l ne...

Page 32: ...uber as Quite el inodoro de la bomba y d jelo a un lado Colocar el inodoro frente a la unidad de bombeo alineando la descarga del inodoro con la entrada de la unidad Aseg rese de que el fuelle cubrir...

Page 33: ...no est n seguras Cuando utilice entradas laterales instale una v lvula de retenci n en la entrada l nea 1 Corte y ajuste en seco la tuber a y los conectores como se requiere para una tuber a de 1 DN2...

Page 34: ...ior del Qwik Jon Premier Copyright 2020 Zoeller Co Todos los derechos reservados 8 Conecte los tubos de entrada deseados de otros accesorios a las entradas laterales del Qwik Jon Premier Use una sierr...

Page 35: ...O 5 Conecte todas las tuber as de entrada al Qwik Jon Premier si lo desea Conecte el cable de alimentaci n a un enchufe de pared para energizar la unidad Copyright 2020 Zoeller Co Todos los derechos r...

Page 36: ...k Jon Premier Copyright 2020 Zoeller Co Todos los derechos reservados 10 Peligro mec nico y el ctrico Desconecte de la fuente de energ a el ctrica antes de manipular el equipo para inspecci n o manten...

Page 37: ...Copyright 2020 Zoeller Co Todos los derechos reservados 11 Qu tate la tapa del Qwik Jon Premier Levante la caja del interruptor y re re la bomba del tanque...

Page 38: ...se puede quitar de la carcasa del interruptor para limpiar el otador La tuber a del codo de descarga se puede desconectar de la voluta de la bomba para limpiarla Copyright 2020 Zoeller Co Todos los de...

Page 39: ...dimiento de la bomba 115V 60Hz 29 5pies 9m Cabeza de cierre 5 10 15 20 25 1 5 3 0 4 6 6 1 7 6 45 39 33 25 13 170 3 147 6 124 9 94 6 49 2 tuber a de 1 DN25 m x 106 32 m tuber a de 3 4 DN20 m x 69 21 m...

Reviews: