Sewage: Access to a sewage line is required. The Qwik Jon
®
Premier requires
a
(DN25)
1"
(or
[DN20]
3/4"
local code allows it) sewage discharge line to
connect to an existing sewage line. A ball or gate valve should
© Copyright 2020 Zoeller Co. All rights reserved.
- 5 -
QWIK JON
®
PREMIER QUICK REFERENCE GUIDE
STEP 1
LOCATION SELECTION
Plan your new installation carefully.
Floor: The
should be structurally sound and level within 1/8" (3 mm). If the
is not level, use hydraulic cement or similar material to level to
the floor.
floor
floor
Water: A water supply will be needed to operate the toilet. Usually a 1/2" (DN15)
line with a shut-off valve is
Electrical: A receptacle of the appropriate voltage will be needed to supply electrical
power to the pump.
Vent: Access to a vent pipe is required in some markets. The use of a mechanical
vent
system is NOT recommended as the toilet will not
NOTE: If a built-in installation is to be used, locate the pump unit in an area that
will allow access to the pump and switch.
OUTLET
WATER
SUPPLY
DISCHARGE
PIPE
VENT
PIPE
LEVEL FLOOR
BALL OR GATE VALVE
SOLD SEPARATELY
SK2588
STEP 2
LEVELING OF PUMP UNIT
Do not use wooden shims to level the pump unit!
Ensure that nails, screws or other sharp objects do not puncture the pump unit!
Level the pump unit to within
(3 mm)
1/8"
using hydraulic cement or similar material.
discharge line.
be installed in the
if
QWIK JON
®
PREMIER
MODEL 201
flush.
sufficient.
2. Never handle a pump with wet hands or when
standing on wet or damp surface or in water.
Fatal electrical shock could occur.
1. Always disconnect power source before attempting
to install, service, or maintain the system.