16
20
20
20
20
Breaker Box
7
IL1353
5
IL1768
Check Valve
Well Point
6
5. Thread in priming plug and then open optional
ball valve if installed by turning handle to line
up with the pipe.
6. PRIMING NOTE: Several priming attempts
may be necessary, depending on the length
of suction pipe and location of check valve if a
well point is being used.
7. Turn on breaker to start pump.
IMPORTANT:
If the pump hums instead of
pumping or turns off repeatedly, shut pump off
immediately.
Check voltage. Make sure your incoming voltage
matches the pump wiring voltage. See wiring
guide in the instructions.