8
97206
DECEMBER 2, 2003 (Round Pool - 1" Rims)
HINT:
Place the sifted earth and sand inside the circle of
rims before installing the pool wall (Step 4).
CARPENTER'S
LEVEL
2 x 4 PLANK
2" CONCRETE
BLOCK
2" BLOCK OF
WOOD
CENTER
STAKE
GROUND
d.
Using a straight 2 x 4 plank, a small block of wood
and a carpenters level, you must level from the
center of the pool to each block as shown in Figure
7.
e.
Find the lowest block in the pool site. Dig down
flush with ground level. Use a torpedo level to level
the block in all directions.
f.
Set 2" block of wood on concrete block, place 2 x
4 plank between center post and block of wood as
shown in Figure 8. Place level on top of 2 x 4.
Gently hammer down center post until 2 x 4 is
perfectly level.
DO NOT move the center post.
Use it as a guide to level all other blocks by placing
the 2" block of wood on the concrete block and
digging the concrete block down until 2 x 4 is level.
g.
Take your time, do one block at a time working your
way around the entire pool. DO NOT CHEAT. They
must be level. Once all blocks are level, recheck
the block you started with to ensure nothing has
moved. If nothing has moved, recheck roundness
Step 3.
ASSEMBLE CIRCULAR BOTTOM FRAMEWORK CONT'D...
FIG. 7
FIG. 8