ZIVE SP2 Instruction manual
- 19 -
2
)
AC data monitoring
4.
Checking points
Power line cables (PC, Monitor, Zive SP2, Printer etc.) should be for earth ground
No fault on system information of Windows 2000/XP/Vista/7/8 control panel
No virus in Software inside PC
Test ZIVE SP2 using dummy cell.
5.
Installation
Refer to SM6 (Smart Manager) manual.
6.
Caution
1
)
Hardware
DO NOT touch the counter electrode lead during a run.
DO NOT remove cell cable lead during a run.
DO NOT locate any noise sources(radio, monitor etc.) near the instrument.
DO NOT block the bottom or side ventilation panels.
PST: potentiostat mode
GST: galvanostat mode
Measured impedance value
|Z|
Voltage
range
Current
range
Frequency
phase
EIS: EIS mode
Summary of Contents for ZIVE SP2
Page 3: ...ZIVE SP2 Instruction manual 3...
Page 17: ...ZIVE SP2 Instruction manual 17 2 Front view Air flowing holes...
Page 37: ...ZIVE SP2 Instruction manual 37 Appendix 3 Cables Dummy cell 1 Cell cable...
Page 38: ...ZIVE SP2 Instruction manual 38 2 Aux cable...
Page 39: ...ZIVE SP2 Instruction manual 39 3 ZRA cable...
Page 40: ...ZIVE SP2 Instruction manual 40 4 Misc cable...
Page 41: ...ZIVE SP2 Instruction manual 41 5 Booster Interface cable...
Page 42: ...ZIVE SP2 Instruction manual 42 6 Dummy Cell...
Page 44: ...ZIVE SP2 Instruction manual 44 3 Cell Connector...
Page 45: ...ZIVE SP2 Instruction manual 45 Appendix 5 CE certificate 1 Declaration of conformity...
Page 46: ...ZIVE SP2 Instruction manual 46 2 EMC test report...