![Zip HydroTap G4 Boiling, chilled sparkling... Installation Instructions Manual Download Page 34](http://html1.mh-extra.com/html/zip/hydrotap-g4-boiling-chilled-sparkling/hydrotap-g4-boiling-chilled-sparkling_installation-instructions-manual_3845670034.webp)
Page 34 of 40
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
The HydroTap
®
G4 is now ready to be commissioned.
•
Turn on the power, gas and water and check for any leaks.
•
Familiarise yourself with the operation of the HydroTap
®
G4 in preparation for use (see user guide).
•
Follow the installation instructions below (and review section C of the user guide).
•
After commissioning, the system may be customised by selecting further options in section G -
Settings, of the user guide.
Section 6
Commissioning
Have a bucket or similar container (not supplied) at the ready to hold a quantity of water that will be ejected
while the filter flush mode is in operation. Open the filter access door on the front of the HydroTap
®
G4 and
the filter cartridge will be exposed. Located to the rear right hand side of the cartridge is a flush line, approx
600mm long and the flush line stop cock. Place the free end of the flush line into the bucket or container (not
supplied).
Note
At first commissioning, the system will select the filter flush screen automatically after CO
2
purge.
Commissioning
• Press the [MENU] button for main menu.
• Press the [Install] button.
• Press the [Purge CO] button.
• In the next screen, press the [START]
button to commence the purging process.
• You will hear the CO
2
gas running through
the tap.
• Run for 10 seconds to fully purge the CO
2
.
• Press the [STOP] button to stop the purge.
• Press [Next] for filter flush screen.
6.2 - CO
2
purge
6.3 - Filter flush
6.1 Select the language
Initial commissioning screen
Language selection screen
Zip BC Sparkling
Zip BC Sparkling