![Zip HydroTap G4 Boiling, chilled sparkling... Installation Instructions Manual Download Page 33](http://html1.mh-extra.com/html/zip/hydrotap-g4-boiling-chilled-sparkling/hydrotap-g4-boiling-chilled-sparkling_installation-instructions-manual_3845670033.webp)
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
Page 33 of 40
Installation instructions
5.7 Chilled and sparkling Hydrotap
®
G4
models
(for Arc / Cube, also refer to the tube kit assembly
instructions supplied with the tap head).
Arc / Cube
Elite
Classic
GAS IN
WHITE
POWER
CABLE
USB
MAINS
IN
SPARKLING
OUT
CO2
IN
BLUE
Note
All plastic / silicon tubes must be trimmed
to size. They must have a constant fall to the
Command-Centre
TM
.The blue chilled and white
sparkling pipes must be insulated with the
sleeving provided.
CHILLED
OUT
Note
Mains hose length is 750mm
Electrical power cable length is 1800mm
Position the Command-Centre
TM
according to the hose
and cable lengths supplied.
BRAIDED
External cold isolation valve
(not supplied)
535mm
280mm
50mm
50mm
Clearance
envelope
(Supplied)
Note
Neither the braided hoses or the tubes supplied with the tap can be lengthened. Take time to consider
hose lengths when determining the mounting positions for the different options, also ensure that the chilled
and sparkling pipes are covered with the insulation provided.