![Zip HydroTap G4 Boiling, chilled sparkling... Installation Instructions Manual Download Page 19](http://html1.mh-extra.com/html/zip/hydrotap-g4-boiling-chilled-sparkling/hydrotap-g4-boiling-chilled-sparkling_installation-instructions-manual_3845670019.webp)
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
Page 19 of 40
All-in-One tap
'Vented' installation
1.16
O-ring
Base block
spider
Base block nut
USB cable
Note
make sure the tap location will allow the tap
spout to drain into the sink.
1.17
Cut a
Ø
50mm hole in the worktop / sink.
Ø
50mm
•
Fit the o-ring to the underside of the AIO tap then pass
tubes, hoses and cable through the Ø50mm hole
.
•
Feed each of the tubes and electrical cable
evenly in between the legs of the base block
spider.
•
Fit the base block spider to the underside of the
All-in-One tap.
•
Clamp in position using the base block nut.
Note
All silicon tubes must be cut to size. They must have
a constant fall back to the Command-Centre
TM
.
(see page 32 for Command-Centre
TM
connections)
Clearance
envelope
535mm
min. 300mm
335mm