804050UK G4 Commercial chilled and sparkling installation instructions - Sept. 2016 - v3.02
Page 17 of 20
The HydroTap
®
G4 is now ready to be commissioned.
•
Turn on the power, gas and water and check for any leaks.
•
Familiarise yourself with the operation of the HydroTap
®
G4 in preparation for use (see User manual).
•
Follow the installation instructions below (and review section C of the User manual).
•
Initially you will be prompted to select the language.
•
After commissioning, the system may be customised by selecting further options in section G -
Settings, of the User manual.
Section 4
Commissioning
Have a bucket or similar container (not supplied) at the ready to hold a quantity of water that will be ejected
while the filter flush mode is in operation. Open the filter access door on the front of the HydroTap
®
G4 and
the filter cartridge will be exposed. Located to the rear right hand side of the cartridge is a flush line, approx
600mm long and the flush line stop cock. Place the free end of the flush line into the bucket or container (not
supplied).
Note
At first commissioning, the system will select the filter flush screen automatically after CO
2
purge.
Commissioning
•
Press the [MENU] button for main menu.
•
Press the [Install] button.
•
Press the [Purge CO] button.
•
In the next screen, press the [START]
button to commence the purging process.
•
You will hear the CO
2
gas running through
the tap.
•
Run for 10 seconds to fully purge the CO
2
.
•
Press the [STOP] button to stop the purge.
•
Press [Next] for filter flush screen.
4.1 - CO
2
Purge
4.2 - Filter flush