10.6. Test Run
10.6.1. Soleo
line
The following is required after every soleo
line
repair (module replacement):
The device must be visually inspected (loose parts, plug connector, etc.)
a safety check must be performed (see chapter 12.1).
10.6.2. Vaco
The following is required after every Vaco repair (module replacement):
The device must be visually inspected (loose parts, cable fixation, plug connector, silicone tube,
Jumper, fuses, etc.)
A test run with a therapy time of 15 minutes must be carried out.
A safety check must be performed (see chapter 12.2).