Installation and Operating Instructions V03
67
10.7 Tools and torque
Tools and torque required for installation and electrical connections.
Tools, model
Object
Torque
Torque screwdriver, T25
Screws for the cover
2.2-2.5Nm
Screw for second protective
grounding connection
Screws for connecting the inverter
and wall bracket
Flat-head screwdriver,
blade with 1×5.5mm
Screw terminal block for AC cable
1.2-1.5Nm
Flat-head screwdriver,
blade with 3.5mm
Sunclix DC connector
Antenna
Hand-tight
Socket
wrench
Open end of 30 Swivel nut of M25 cable gland
Hand-tight
Open end of 24
Swivel nut of M20 cable gland
Hand-tight
Open end of 15 Swivel nut of sunclix connector
2.0Nm
Open end of 10
Hex bolts for wall bracket
Hand-tight
Wire stripper
Peel cable jackets
Crimping tools
Crimp power cables
Hammer drill,
drill bit of Ø10
Drill holes on the wall
Rubber mallet
Hammer wall plugs into holes
Cable cutter
Cut power cables
Multimeter
Check electrical connection
Marker
Mark the positions of drill holes
ESD glove
Wear ESD glove when opening the
inverter
Safety goggle
Wear safety goggle during drilling
holes.
Anti-dust respirator
Wear anti-dust respirator during
drilling holes.