![Zeversolar Zeverlution 1000S Assembly, Installation And Operating Instructions Download Page 56](http://html2.mh-extra.com/html/zeversolar/zeverlution-1000s/zeverlution-1000s_assembly-installation-and-operating-instructions_3582575056.webp)
Installation and Operating Instructions V03
55
7.
Use a suitable measuring device to check that no voltage is present at the AC
screw terminal blocks between L and N and L and PE.
8.
Unscrew the screws of the screw terminal blocks and the swivel nut of the
M20 cable gland, remove the AC cable .
9.
Secure the cover (torque: 2.2 - 2.5 Nm) using a screwdriver (T25).
Damage to the inverter due to electrostatic discharge
•Touching electronic components can cause damage to or destroy the
inverter through electrostatic discharge.
• Ground yourself before touching any component.