95
ELECTRO-HYDRAULIC SYSTEM
F_02_172
WORK IN THE FIELD
Perform the steps described in the
“Blocking cancellation” section and set
the required position of the elements with
regard to the character of the planned
work. The control (4) is used to achieve
the depth of the implement. To set the
control type and their combination use
the control (6).
Power control symbol
Positional control symbol
The control activity (lifting and lowering)
can be monitored with the use of the in-
dication diodes (8) and (9). At the dead
point shift the lever (1) to position (a) and
after reversing of the direction move it to
position (c) again. The control system will
return to the previous working position
(ploughing memory). The control (3) is
used to set the required lowering speed.
Summary of Contents for FORTERRA 95
Page 1: ......
Page 2: ......
Page 7: ...7 LOCATION OF SERIAL NUMBERS XH154...
Page 32: ...32 ACQUAINTANCE WITH THE TRACTOR B21a...
Page 34: ...34 ACQUAINTANCE WITH THE TRACTOR F54b...
Page 46: ...46 NOTES...
Page 64: ...64 NOTES...
Page 68: ...68 NOTES...
Page 80: ...80 NOTES...
Page 106: ...106 NOTES...
Page 120: ...120 NOTES...
Page 130: ...130 NOTES...
Page 176: ...176 NOTES...
Page 190: ...190 NOTES...
Page 197: ......