PREMIER AD INSTALLATION MANUAL.
Software:PANEL:R1107 & LOOP:R1062
Approved Document No: GLT.MAN-105A
PAGE 10
Issue : 2.02 Authorised: GH Date: 16/07/2007
7.1 SPECIFIC DEVICE WIRING INSTRUCTIONS
Fyreye Common Base
FE-CB
80-050
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
L2
L1
IO
UT
L1
IN
-R
Fyreye Loop Isolator Base
FE-IB
80-090
L2
L1
IO
UT
L1
IN
-R
-
- -
+ +
IN
OUT
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
Fyreye Addressable Detector Relay Base
FEA-RB
80-080
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
L2
L1
IO
UT
L1
IN
-R
C
RELAY
OUTPUT
Note that on the Fyreye Loop Isolator Base, the
loop wiring connects to the terminal block on the
PCB and NOT to the Base Spring Screws.
The terminals are & - in,
and +,- &- out.
The second –ve contact can be used
during commissioning to check the loop
integrity.
(Connect the –in to the spare – out.
Repeat for all isolators. Measure –ve line
resistance with a DVM. Return the –in
cable to its original terminal block when
tests completed.)
Zeta Manual Call Point (Resetable)
ZT-CP2/AD
43-305 (43-002)
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
Fyreye Addressable Sounder Base
FEA-SB
80-100
L2
L1
IO
UT
L1
IN
-R
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
14
3
2
ON
Summary of Contents for NPAD 2
Page 1: ...INSTALLATION MANUAL...