Z 45/75-90/110
30
Installation
www.zepro.com
M8x20 8.8 (25 Nm)
Image 36. Installing aluminium profiles.
Image 37. Installing aluminium profiles.
5.
Fasten the aluminium profiles with two M8x20
(8.8) bolts each. The head of the bolt is threaded
in the aluminium rail and the rail is then posi-
tioned and screwed into the bracket. Tightening
torque 25 Nm.
NOTE!
When installing on ZLU 45/75-90/110, more pow
-
erful brackets are used for the internal aluminium
rail compared to other models.
Summary of Contents for Z 45-90
Page 2: ......