c) Cold water supply with a minimum working pressure of 70 kPa
and a maximum working pressure of 700 kPa connected via an
isolation valve.
d) Outlet drainage to a sink draining board or to a drip tray.
e) Access to drainage from a vent situated at the base of the
heater.
f) If the water pressure is likely to exceed 700 kPa, a 350 kPa
pressure reducing valve must be installed in the cold water supply
line.
f) In all installation instances the walls of the heater must be
vertical and the base horizontal, there can be no exceptions to
this rule.
Before You Begin
Refer to the mounting-hole template on page 17.
Read the installation and operating instructions completely.
Decide whether to install with concealed or exposed plumbing and/
or electrical connections. Concealed connections are preferred for
superior appearance.
Step 1 – Positioning
Position the heater so the tap will drain on to a draining board or
drip tray.
Position the base of the tap to be not less than 300 mm above the
draining board (height should be increased only if essential for
filling larger vessels).
Provide clearance for service access of not less than 100 mm top,
150 mm left, 20 mm right.
Mark corner positions for the heater on the wall so as to position
the paper mounting-hole template.
Step 2 – Fastening
Position mounting-hole template on wall and drill holes where
shown.
Remove cover fastening screws from heater and lift whole cover off
heater.
Installation Procedures
COLD
INLET
VENT
OUTLET
INLET
POSITION
VENT
POSITION
Approximate Weight When Filled
100 mm
minimum
clearance
20 mm
minimum
clearance
from right
edge to wall
300 mm
150 mm
3.0 Litre models
12.5 kg
5.0 Litre models
16.5 kg
7.5 Litre models
20.5 kg
Installation Requirements