START-UP
Carl Zeiss
Installation Requirements
Cell Observer SD
38
423638-7044-001
M60-2-0021 e 01/2009
3.1.2
Power Requirements
For line power supply, three wall sockets at a maximum distance of 1.5 m from the laser module are
required.
Use the three power strips (included in delivery) for connection of the system components (refer to
Fig. 3-2).
The multiple socket-outlets must not be connected in series!
The multi-laser module must be grounded. Delivery includes an earth cable (AWG10 green/
yellow) for this purpose (see Fig. 3-2).
At each end of the earth cable there are cable lugs of 8 mm inner diameter. The installation
room must contain a fixed earth-ground connection point.
Fig. 3-2
Terminal assignments of connector strips
Summary of Contents for Cell Observer SD
Page 1: ...l j l pa...
Page 68: ......