14.
Note: the STD self-test is the same as the Fast self-test
except that the waiting times are longer (about 12
minutes for the fast self-test compared to 45
minutes for the STD self-test).
Before running the self-test make sure the correct country
code has been set!!!
1.Settings
11.Self-test
1. Fast self-test
2. STD self-test
22.
SELF-TEST
21.
OPERATION OF PHOTOVOLTAIC SYSTEM ONLY
The system can also work as a photovoltaic
inverter only, and therefore without batteries.
In this case, the display will only show the
values relating to:
.Photovoltaic production
.Load consumption
.Power exchanged with the grid
NOTE:
In this case, the AC wire must be
connected to the GRID port
CT
HYBRID
PV panels
\\
Meter
Utilities