youngmangroup.com
23
Platform Height 2.00 Metres
1. Erect the Safety Cage as described on pages 8 to 10.
Refer to the diagrams on page 24 and 25.
2. Place your foot on
RUNG 9
and lift
RUNG 3
on the LEFT frame until locked.
3. Place your foot on
RUNG 9
and lift
RUNG 3
on the RIGHT frame until locked.
4. Place your foot on
RUNG 9
and lift
RUNG 4
on the RIGHT frame until locked.
5. Place your foot on
RUNG 9
and lift
RUNG 4
on the LEFT frame until locked.
6. Place your foot on
RUNG 9
and lift
RUNG 5
on the LEFT frame until locked.
7. Place your foot on
RUNG 9
and lift
RUNG 5
on the RIGHT frame until locked.
8. Place your foot on
RUNG 9
and lift
RUNG 6
on the RIGHT frame until locked.
9. Place your foot on
RUNG 9
and lift
RUNG 6
on the LEFT frame until locked.
10. Attach the Platform to
RUNG 3
as described on pages 11 and 12.
11. See ‘Fitting the Platform Stabilisers’ described on pages 14 and 15.
12. Extend and lock a platform stabiliser above the rung containing the
RED
bracket until
RED
shows in the viewing window in the stabiliser. Ensure it is
locked.
13. Place the stabiliser hook over the
RED
bracket and push down to lock it
in place.
14. Repeat steps (12) and (13) for each of the other platform stabilisers.
15. Fit the Toe boards as described on page 13.
16. Deploy the ground stabiliser legs as described on page 7.
Step 5: Setting the Platform Height
Platform Height
Extend Rungs
3, 4, 5 & 6
7
Rung
2.00m
Summary of Contents for TTA02
Page 35: ...35 youngmangroup com Notes...