youngmangroup.com
Collapsing the Tower
Warning
The platform must ALWAYS be removed prior to collapsing the Tower.
1. Remove any tools or other items that are on the platform.
2. Remove the Toe board from the platform.
3. Unfasten the four Platform Stabilisers and stow under the platform as described
on page 15.
4. Unfasten the two spring-catches that hold the platform to
RUNG 3
.
5. Carefully lift the Platform off each
RUNG 3
and take the Platform to a safe place
away from the Tower.
Warning
Always begin collapsing Tower assembly by starting from RUNG 7.
Remember
The red and yellow buttons operate as follows:
• The buttons on
RUNG 7
release the locking mechanism for
RUNG 6
which allows
RUNG 6
and all above to move down .
• The buttons on
RUNG 6
release the locking mechanism for
RUNG 5
which allows
RUNG 5
and all above to move down.
• The buttons on
RUNG 5
release the locking mechanism for
RUNG 4
which allows
RUNG 4
and all above to move down.
• The buttons on
RUNG 4
release the locking mechanism for
RUNG 3
which allows
RUNG 3
and all above to move down.
• The buttons on
RUNG 3
release the locking mechanism for
RUNG 2
which allows
RUNG 2
and all above to move down.
• The buttons on
RUNG 2
release the locking mechanism for
RUNG 1
which allows
RUNG 1
to move down.
26
Summary of Contents for TTA02
Page 35: ...35 youngmangroup com Notes...