JOHNSON CONTROLS
61
SECTION 3 - HANDLING, STORAGE, INSTALLATION AND REASSEMBLY
FORM 201.30-ICOM1 (519)
ISSUE DATE: 05/22/2019
3
FORM 201.30-CL1
ISSUE DATE: 4/20/2017
P.O. Box 1592, York, Pennsylvania USA 17405-1592
800-861-1001
Subject to change without notice. Printed in USA
Copyright © by Johnson Controls 2017
www.johnsoncontrols.com
ALL RIGHTS RESERVED
Form 201.30-CL1 (417)
Issue Date: April 20, 2017
Supersedes: 201.30-CL1 (513)
6. Connect the following optional analog inputs to
their respective terminals of 1TB Terminal Block
a. Leaving Chilled and Condenser Temperature
Reset Control - Terminals 17 and 18 .............
b. Current Limit Reset Control -
Terminals 19 and 20 .......................................
c. Remote Mode Selection (Optional Heat
Pump) - Terminals 40 and 41 .........................
E. TESTING, EVACUATION AND CHARGING
(Under Johnson Controls Supervision)
NOTE:
This section does not apply for chillers
shipped with refrigerant installed at the factory.
1. R-134a/R-513A available for testing ..................
2. Dry nitrogen available for testing (Grade B or
better) ..................................................................
3. A high vacuum pump available to evacuate
and dehydrate system ........................................
4. Refrigerant (supplied by Johnson Controls) is
available for charging ..........................................
5. Unit has been or is ready to be been pressure
tested, evacuated, dehydrated, and charged .....
F. CONDITIONS
1. YORK oil for compressor available ....................
2. Cooling load available for testing and operating
unit .....................................................................
3. Personnel available for final wiring
connections ........................................................
4. Personnel available for start-up and testing .......
Owner's operating personnel:
Name:
_______________________________Phone ______________
Name:
_______________________________Phone ______________
With reference to the terms of the above contract, we are requesting the presence of your JCI Authorized Representative at the job site on
______ / ______ / ______
to start the system and instruct operating personnel. Have the JCI representative contact: ____________________________________
We understand that the services of the Johnson Controls Authorized Representative will be furnished in accordance with the contract for a period of time of not
more than _______ consecutive normal working hours, and we agree that a charge of _________ per diem plus travel expenses will be made to Johnson Controls
if services are required for longer than ________ consecutive normal hours or if repeated calls are required, through no fault of Johnson Controls.
Month
Day
Year
Name/Phone
Customer/Contractor Signature: _______________________________________ Title: __________________
Form Completed by: __________________________________________________ Date: _________________
CONTRACTOR'S RESPONSIBILITIES AND INSTRUCTIONS TO USE FORM
This installation checklist provides a quick way to check if all necessary installation work was completed in accordance with all
applicable installation instructions in the unit Installation, Operation and Maintenance manual, and when completed, acts as a
request for Johnson Controls to furnish start-up supervision.
Complete this form as follows:
1. Fill out the top of the page.
2. Check off each item as required. Cross out (x) items that do not apply.
3. Enter names, initials, and date of the operating personnel who completed the checklist.
4.
Bottom of Form:
Enter the date that the Johnson Controls start-up technician should be at the job site and the name(s) of
the supervisor(s) to be contacted.
Retain one copy in files and send one copy to customer.
Summary of Contents for YVWA