JOHNSON CONTROLS
3
FORM 201.30-ICOM1 (519)
ISSUE DATE: 05/22/2019
MANUAL DESCRIPTION
FORM NUMBER
YVWA Chiller Installation Checklist
201.30-CL1
YVWA Chiller Start-up Checklist and Request for Authorized Start-up Technician
201.30-CL3
Field Connections and Control Wiring for YVWA Chiller
201.30-PW1
YVWA Renewal Parts
201.30-RP1
Limited Warranty
50.05-NM2
Shipping Damage Claims
50.15-NM
Long-Term Storage Periodic Checklist and Logs for YR, YS, and YVWA Screw Chillers
50.20-CL9
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically
to the manual or product owner. Updated manuals, if
applicable, can be obtained by contacting the nearest
Johnson Controls Service office or accessing the John-
son Controls QuickLIT website at
.
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of
the equipment prior to performing any work on the
equipment.
CHANGE BARS
Revisions made to this document are indicated with a
line along the left or right hand column in the area the
revision was made. These revisions are to technical in-
formation and any other changes in spelling, grammar
or formatting are not included.
ASSOCIATED LITERATURE
Summary of Contents for YVWA
Page 155: ...JOHNSON CONTROLS 155 NOTES...