JOHNSON CONTROLS
94
FORM 150.73-NM1
ISSUE DATE: 09/04/2020
SECTION 5 – TECHNICAL DATA
LD13762B
D
D
TOP BOLT
CL
SECTION D-D
TOP WASHER
("A")
("B")
CL
("C")
("B")
Installation of Durulene Vibration Isolators
1. Read instructions in their entirety before begin-
ning installation.
2. Isolators are shipped fully assembled and are to
be positioned in Accordance with the submittal
drawings or as otherwise recommended.
3.
Set isolators on floor, housekeeping pad, or sub-
base, ensuring that all Isolator centerlines match
the equipment mounting holes. The vmc group
Recommends that the isolator base ("a") be in-
stalled on a level surface. Shim or grout as re-
quired, leveling all isolator bases to the same
Elevation (1/32-in. maximum difference can be
tolerated).
4. Bolt or anchor all isolators to supporting structure
utilizing base Thru holes ("b").
5. Remove top bolt and top washer. Place equip-
ment on top of isolators so That mounting holes
in equipment or base line up with threaded hole
("c").
6. Reinstall top bolt and washer and tighten down.
7. Installation is complete.
Summary of Contents for YLUA0078
Page 10: ...JOHNSON CONTROLS 10 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...JOHNSON CONTROLS 42 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...JOHNSON CONTROLS 100 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 130: ...JOHNSON CONTROLS 130 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 152: ...JOHNSON CONTROLS 152 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...