JOHNSON CONTROLS
3
FORM 150.73-NM1
ISSUE DATE: 09/04/2020
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically
to the manual or product owner. Updated manuals, if
applicable, can be obtained by contacting the nearest
Johnson Controls Service office or accessing the John-
son Controls Knowledge Exchange website at
docs.johnsoncontrols.com/chillers/
.
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
ASSOCIATED LITERATURE
MANUAL DESCRIPTION
FORM NUMBER
Installation and Start-up Checklist
150.73-CL2
Limited Warranty Engineered Systems Equipment
50.05-NM2
Shipping Damage Claims
50.15-NM
AFFECTED PAGES
DESCRIPTION
3
Conditioned Based Maintenance program information added
18
Motor Current Module paragraph removed
85
Isolator locations updated in image and dimensions updated in table for YLUA0098 to YLUA0130
89
Isolator Locations section removed
REVISION NOTES
Revisions made to this document are indicated in the following table. These revisions are to technical information,
and any other changes in spelling, grammar, or formatting are not included.
CONDITIONED BASED MAINTENANCE
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the traditional
maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.
Summary of Contents for YLUA0078
Page 10: ...JOHNSON CONTROLS 10 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 42: ...JOHNSON CONTROLS 42 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 100: ...JOHNSON CONTROLS 100 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 130: ...JOHNSON CONTROLS 130 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 152: ...JOHNSON CONTROLS 152 FORM 150 73 NM1 ISSUE DATE 09 04 2020 THIS PAGE INTENTIONALLY LEFT BLANK...