background image

035-16408-001 Rev. B (101)

Unitary Products Group

7

FIELD CONNECTIONS - CONTROL WIRING

The recommended field connections for specific indoor air
handlers and furnaces are shown in Figures 4 through 7. All
connects to the outdoor unit are made in the low voltage box
in the bottom right corner of the control box. See Figure 3.
Feed all control wiring through the grommet in the bottom of
the box. Care should be taken so that all wire nut connections
are firm with no exposed wires that could short within the box.
If the fault line (X/L) is not connected to the thermostat, it
should be capped securely inside the box.

Variable Speed Air Handlers and Furnaces

 - connections

shown in Figure 4. The first stage thermostat signal is con-
nected to Y1 at the air handler/furnace control. It is critical the
Y2 OUT signal is connected to Y at the air handler/furnace
control to properly control the blower speed.

Single Speed Air Handlers and Furnaces

 - connections

shown in Figures 5 and 6. It is mandatory to connect the
appropriate blower relay to operate the low speeds. The first
stage thermostat signal is connected directly to Y1 on the
outdoor unit. Do not connect to Y at the indoor control. The
first stage blower operation is controlled by the G signal. It is
critical the Y2 OUT signal is connected to Y at the air handler/
furnace control to properly control the blower speed by
switching the relay to the high speed tap.

Two Stage Furnaces

 - connection shown in Figure 7. The

first stage thermostat signal is connected directly to Y1 on the
outdoor unit. Do not connect to Y at the indoor control. The
first stage blower operation is controlled by the G signal. It is
critical the Y2 OUT signal is connected to Y at the furnace
control to properly control the blower speed.

WIRING DIAGRAMS

 FIGURE 4 : 

WIRING FOR USE WITH VARIABLE SPEED AIR HANDLERS OR FURNACES

   

 

   

       

      

   

 

 

 

 

   

   

 

OUTDOOR UNIT

CONTACTOR

WIRE NUT

VARIABLE SPEED

FURNACE AND

AIR HANDLER

THERMOSTAT

TYPICAL

TWO STAGE

COOLING

THERMOSTAT

MUST BE USED

X, Y1, Y2, HUM

LOCATED ON CFM 

SELECTION BOARD

POWER

CONTROL

FACTORY

(CLASS 1 WIRING)

(CLASS 2 WIRING)

POWER WIRING

208/230-1-60

TS 

CONTROL

HUMIDISTAT

GND. 

LUG

T2

T1

L2

L1

M1

BLK

RED

BRN

YEL

ORG

PUR

C

R

Y2

Y1

X/L

2

C

R

Y2

Y1

G

W1

W2

X/L

O

X

W2

W1

G

Y

Y1

Y2

C

R

1

HUM

1

CONNECT FOR THERMOSTAT WITH FAULT
LIGHT INDICATOR ONLY, CAPTHIS WIRE
IF NOT USED.

2

HUMIDISTAT: MAKES CIRCUIT ON HUMIDITY FALL

(JUMPER ON CFM SELECTION
BOARD MUST BE REMOVED)

Y2 OUT

Summary of Contents for H1TC048

Page 1: ...NERAL INFORMATION GROUNDING 6 POWER WIRING 6 ACCESSORY WIRING 6 THERMOSTAT MOUNTING WIRING 6 DE HUMIDIFICATION CONTROL 7 FIELD CONNECTIONS CONTROL WIRING 7 INDOOR BLOWER SPEED SETTINGS 7 WIRING DIAGRA...

Page 2: ...en to alert the installer that severe per sonal injury death or equipment damage may result if instal lation procedures are not followed properly LIMITATIONS The unit should be installed in accordance...

Page 3: ...ined location 2 Remove the shipping carton and inspect for possible damage 3 Compressor tie down bolts should remain tightened 4 Position the unit on the base provided 5 Make a hole s in the structure...

Page 4: ...nstalled only with the tubing sizes for approved system com binations as specified in Tabular Data Sheet The charge given is applicable for total tubing lengths up to 15 feet See Application Data Form...

Page 5: ...g the service port flare caps to be sure they are leak tight DO NOT OVERTIGHTEN between 40 and 60 inch lbs maximum NOTE Do not use the system refrigerant in the outdoor unit to purge or leak test 9 Do...

Page 6: ...EC Class 2 from the thermostat to the indoor unit and outdoor unit Route the control wiring into the grommeted hole in the bottom of control box of the outdoor unit Using wire nuts connect to leads in...

Page 7: ...y to Y1 on the outdoor unit Do not connect to Y at the indoor control The first stage blower operation is controlled by the G signal It is critical the Y2 OUT signal is connected to Y at the air handl...

Page 8: ...TROL CLASS 2 WIRING POWER WIRING 208 230 1 60 GND LUG T2 T1 L2 L1 M1 BLK RED BRN YEL ORG PUR C R Y2 Y1 R Y2 Y1 G W1 W2 X L W2 W1 G Y C R 1 2 Y2 OUT X L C LOW HIGH FIGURE 6 WIRING FOR USE WITH SINGLE S...

Page 9: ...T USED 2 OUTDOOR UNIT WIRE NUT CONTACTOR THERMOSTAT P DU P XU 2 STAGE FURNACE TYPICAL TWO STAGE COOLING THERMOSTAT MUST BE USED DEHUMIDISTAT OPTIONAL POWER CONTROL FACTORY CLASS 1 WIRING TS CONTROL CL...

Page 10: ...ed with the matching thermostatic expansion valve kit listed in the tabular data sheet The best way to check the system charge is by check ing the system subcooling during the second stage of opera ti...

Page 11: ...15 of the pro grammed speed during the dehumidification mode This lower airflow reduces the evaporator temperature increasing the latent capacity The humidistat for these variable speed systems opens...

Page 12: ...maintenance Instruct the owner or the opera tor how to start stop and adjust temperature setting The installer should also instruct the owner on proper opera tion and maintenance of all other system...

Reviews: