Installation Instructions

Inspection

Upon  reception,  inspect  the  equipment  and 

notify  both  the  carrier  and  the  insurance 

company, in writing, of any possible damage.

Environmental protection

Eliminate  packing  in  accordance 

with  the  regulations  in  force  on 

environmental conservation.

During installation and maintenance, keep 

in  mind  that  HFC-410A  and  oil  POE  are 

used.

Contains  greenhouse  effect  fluorided 

gas covered by the Kyoto protocol.

For the type of gas and quantity per system, 

see  the  identification  plate.  GWP  (Global 

Warming Potential): 2088.

Transportation

Transport to final place of installation always 

with the symbols in vertical position.

Clearances

Leave  clearances  for  maintenance  access, 

changing  air  filters  and  air  discharge.  (Fig. 

1).

Installation of indoor unit

These units can be installed either vertically 

on the floor, horizontally beneath the ceiling 

or vertically on a wall. (Fig. 2).

Fastening

Remove side panels and air intake grill, as 

shown in drawings. (Figs. 3, 4 & 5).

Fasten  mounting  supports  to  the  wall  or 

ceiling.  For  ceiling  units,  installation  near 

a wall makes tubing layout easier. Use the 

perforations in the unit casing to orient the 

direction of the tubing.

Fit the unit onto the mounting supports.

Make sure the unit is levelled so  condensed 

water drain is carried out correctly.

Condensed water drain

The unit drain pipe is flexible and adjusts to 

various layouts. The drain line must include 

a U-shaped elbow siphon. Connect a plastic 

hose with a 16 mm. outer diameter (Fig.6).

Checking drain

Make sure water evacuation is carried out 

correctly. (Fig. 7).

Electrical connections

So  installation  may  be  correct,  the  unit 

must be grounded.

Wiring should follow, at all times, established 

national regulations.

Also  check  the  tension  limits.  Make  sure 

electric connections are tight so as to avoid 

overheating and failure risks.

Cable section

Sizes

09

12

18

24

30 36, 42, 48 (1ph)

36, 42, 48 (3ph)

60

Power supply

mm

2

3 x 

2,5

3 x 4

3 x 6

3 x 6 (1ph)

5 x 4 (3ph)

5 x 4

Interconnection

(ind./out.)

2 x 0,25

Fuse 

(D Curve)

A 13

20

25

25

16

20

20

20

Prior to final approval of the

installation

Check:

-  The voltage is always between 

198-254 V.

-  The power supply cable section 

is, at least, that recommended.

-  Condensed  water  drainage 

is  carried  out  correctly,  and 

there are no leaks in the water 

circuit.

-  Operating  instructions  have 

been given to the user.

-  Information has been given on 

the  need  to  clean  the  air  filter 

periodically.

-  Maintenance  instructions  have 

been  given,  or  a  contract  has 

been  made  for  periodical 

servicing.

Wiring

GB

ATTENTION

Your product is marked with this symbol. This means that at the end of its service life it should not be mixed 

with other non-classified household waste. Therefore, disposal should be carried out in compliance with the 

corresponding local and national regulations, in a correct and environment-friendly manner.

The dismantling of the air conditioning unit, as well as the processing of refrigerant, oil and other components, 

should be carried out by a qualified technician and in compliance with the applicable legislation.

Contact your local authorities for further information

All data and dimensions are subject to change without prior notice.

EOKC 09, 12, 18, 24, 30, 36, 42, 48 D

EOKC 36, 42, 48, 60 D

Fig. 8

OUTDOOR UNIT

OUTDOOR UNIT

INDOOR UNIT

INDOOR UNIT

Summary of Contents for EOKC 09 D

Page 1: ...es Produits Certifiés dans le programme AC1 AC2 AC3 LCP et FC Le programme LCP recouvre les groupes refroidisseurs de liquides froid seul et réversible à condensation par air jusqu à 600 kW Johnson Controls Manufacturing España S L participa no Programa de Certificação EUROVENT Os produtos correspondem aos referidos no Directório EUROVENT de Produtos Certificados no programa AC1 AC2 AC3 LCP e FC O...

Page 2: ...by johnson controls 2 ...

Page 3: ...by johnson controls 3 Fig 1 30 cm 150 cm 100 cm 60 cm 60 cm Fig 2 Fig 3 Fig 4 Fig 5 Fig 6 OK Fig 7 ...

Page 4: ...luß Voedingsspanning Strømforsyning V ph Hz 230 1 50 230 1 50 380 3 50 380 3 50 Caudal Flow Débit Caudal Portata Durchsatz Luchtdebiet Strøm Velocidad alta High speed Grande vitesse Velocidade elevada Velocità alta Hohe Ges chwindigkeit Hoge snelheid Høy hastighet m3 h 650 700 900 1200 1600 2000 2000 2300 2300 Control Control Contrôle Controlo Comando Bedienung Regeling Kontroll Infrarrojos Infrar...

Page 5: ...e 16 mm Fig 6 Verificación del drenaje Verificar que la evacuación de agua se rea liza correctamente Fig 7 Conexiones eléctricas Para que la instalación sea correcta la uni dad debe conectarse a tierra En la instalación eléctrica deben seguirse en todo caso las reglamentaciones nacio nales establecidas Comprobar tambien los límites de tensión Asegurarse de que quedan fuertemente fi jadas las conex...

Page 6: ...ater evacuation is carried out correctly Fig 7 Electrical connections So installation may be correct the unit must be grounded Wiringshouldfollow atalltimes established national regulations Also check the tension limits Make sure electric connections are tight so as to avoid overheating and failure risks Cable section Sizes 09 12 18 24 30 36 42 48 1ph 36 42 48 3ph 60 Power supply mm2 3 x 2 5 3 x 4...

Page 7: ...rancher un tuyau en plastique de 16 mm de diamètre extérieur Fig 6 Vérification du drainage Vérifier si l écoulement de l eau se fait correctement Fig 7 Connexions électriques Pour que l installation soit correcte l unité doit être reliée à la terre L installation électrique doit être faite en conformité avec la réglementation nationale en vigueur Contrôler aussi les limite de voltage S assurer qu...

Page 8: ...o em U Há que ligar um tubo de plástico com um diâmetro exterior de 16 mm Fig 6 Verificação da drenagem Há que verificar que a evacuação da água seja correctamente realizada Fig 7 Ligações eléctricas Para que a instalação seja correcta a unidade deve ser ligada à terra Em qualquer caso na instalação eléctrica devem se seguir as regulamentações nacionais estabelecidas Há que verificar também os lim...

Page 9: ...ro esterno di 16 mm Fig 6 Controllo dello scarico Controllare che lo scarico dell acqua avvenga correttamente Fig 7 Collegamenti elettrici Per una buona installazione l unità deve essere collegata a terra Nella realizzazione dell impianto elettrico rispettare sempre la normativa nazionale vigente Controllare anche i limiti di tensione Accertarsi che tutti i cavi siano ben collegati per evitare ris...

Page 10: ... mm anschließen Fig 6 Überprüfung des Kondensatablaufs Korrekten Ablauf des anfallenden Kondensats überprüfen Fig 7 Elektrische Anschlüsse Für einen ordnungsgemäßen Betrieb muss die Anlage entsprechend geerdet werden Den nationalen Sicherheitsauflagen ist beim elektrischen Anschluss unter allen Umständen Folge zu leisten Spannungsgrenzen überprüfen Locker sitzendeKabelkönnenzueinerÜberhitzung der ...

Page 11: ... afb 6 Controleren van de afvoer Controleer of het water goed afgevoerd wordt afb 7 Elektrische aansluiting Voor een correcte installatie dient de unit geaard te worden In elk geval dienen de geldende landelijke voorschriften in acht genomen te worden Controleer tevens de spanningsgrenzen Let erop dat de elektrische aansluitingen goed vast zitten om oververhitting en storingen te voorkomen Elektri...

Page 12: ...ter på 16 mm Fig 6 Kontroll av drenasjen Sjekk at tømmingen av vannet skjer på korrekt måte Fig 7 Elektriske koblinger For at en korrekt elektrisk installasjon skal være korrekt må den jordes Den elektriske installasjonen må til enhver tid foretas i henhold til gjeldende etablerte nasjonale forskrifter Sjekk også spenningsgrensene Man må forsikre seg om at de elektriske koblingene er godt festet f...

Page 13: ......

Page 14: ......

Page 15: ...6 1 EN61800 3 EN ISO 9001 EN ISO 14001 2006 95 CEE 2004 108 CEE 97 23 CEE NORMAS INTERNACIONALES Y ESPECIFICACIONES TÉCNICAS APLICADAS Paseo Espronceda 278 08204 SABADELL TYPE EC STANDARDS APPLIED DECLARATION OF COMPLIANCE ON MACHINERY MANUFACTURER JOHNSON CONTROLS MANUFACTURING ESPAÑA S L ADDRESS We hereby certify that the mentioned equipment has been designed manufactured and tested in accordanc...

Page 16: ...www johnsoncontrols com ...

Reviews: