![YOKOGAWA ZR22S User Manual Download Page 169](http://html1.mh-extra.com/html/yokogawa/zr22s/zr22s_user-manual_3505092169.webp)
<11. Inspection and Maintenance>
11-5
11.1.3 Replacement of the Heater Unit (Assembly)
This Subsection describes the replacement procedure for the heater unit.
The sensor or ceramic heater-furnace core internal structure is subject to fracturing, so do NOT
subject it to strong vibrations or shock. Additionally, the heater unit reaches high temperatures
and is subjected to high voltages. So, maintenance services should be performed after the power
is off and the heater unit temperature has returned to normal room temperature.
For details, refer to IM11M12A01-21E “ Heater Assembly ”.
NOTE
If the heater strut assembly cannot be removed because a screw has fused to its thread, one of
our service representatives can fix it.
IM 11M13A01-02E
Summary of Contents for ZR22S
Page 11: ...Blank Page...
Page 19: ...Blank Page...
Page 23: ...Blank Page...
Page 52: ...2 Specifications 2 29 IM 11M13A01 02E...
Page 70: ...Blank Page...
Page 134: ...Blank Page...
Page 164: ...Blank Page...
Page 190: ......
Page 192: ......
Page 194: ......
Page 196: ......
Page 198: ......
Page 200: ......
Page 202: ...Blank Page...
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......