
<3. INSTALLATION>
3-4
IM 01R01B30-00E-E 6th edition October 01, 2014 -00
All Rights Reserved. Copyright © 2003, Rota Yokogawa
1
2
3
5
15 mm
4
F6.EPS
F7.EPS
- Strip the sheath to a length of approx. 15 mm
(fig. 3-4) and slide the union nut (1), the cap (2)
and the rubber seal (3) onto the conductor.
Fig. 3-4
Fig. 3-5
- Slide the rubber seal as far as the rim of the insulation and then slide the cap onto the rubber seal.
This provides the strain relief for the conductor (fig. 3-5).
To connect the conductor, please observe in particular the following steps :
Summary of Contents for RAKD series
Page 2: ...Blank Page ...