3
WARNING
Dear users, please read below points before using the machine:
1. Take out the screw rod before running the machine. Otherwise, it will damage the machine.
(See below picture).
2. When the machine need to be transported again, the screw rod must be re-install to the
machine before transporting. (See below picture).
3. Avoid to operate the machine overload, the maximum load is 35KG.
4. Forbid running this machine in explosive environment.
5. This machine only can be operated by trained personnel.
6. Forbid running this machine without drum in it.
7. Make sure the drum is sealed and without leakage.
8. Make sure the machine leveled after installing or moving.
9. Check if the machine legs are leveled if there's abnormal vibration and noise.
10. For your safety, please make sure the machine is grounding reliably.
Caution:
Take out this
screw rod before running
the machine.Otherwise, it
will damage the machine
.
Summary of Contents for YJ-2S
Page 16: ...16 Shaker Part ...