V2.3.0 OM-UNN valid from 15
th
April 2015
16
3
Operation
3.1
Switch On the Analyzer
Power on the analyzer by pressing the on-off switch located at the back of the instrument to “
I
”
position as marked.
Once the analyzer is powered on, there is a prompt from the Front Cover which is a GREEN Led
powered.
3.2
Getting Started
Launch the operation software by clicking on the application Icon, and the main operating screen will be
displayed as shown in (Fig. 3-1)
Fig.3-1 Main Operation Interface
3.3
Self-check
The instrument is required to execute a self-check before cycle. In order to maintain the instrument in
optimum operating condition, it is also required to perform a Self-check every 24 hours. The instrument will
not perform any kind of analysis if a Self-check is overdue.
Click the Self-check button on screen to execute. The information on Self-check status is reported at the left
side of the Working Window (See Fig. 3-2).
When a Self-check cycle is aborted as the result of an error, the Self-check program will be stop at the last