30
sub assembly Cont.
assembly
stabilizinG link subassembly
apply ti prep to the M6x1x12 ti
Male Bolt.
stabilizinG link subassembly
attach the ti Male Bolt and pivot
pin Washer to the 12mm x 42mm pivot pin and tighten using a 5mm
and 6mm allen keys.
torque spec: 125-150 inch/pounds.
stabilizinG link subassembly
place the 38802 2rs Max
Bearings into the tail of the stiff link h, make sure the extended race
is pointing outwards. slide the 12.7mm x 7mm pivot pins into the bearings
as shown. screw the M4x.7x16 socket caphead mounting bolts into the link.
Just torque lightly so the bearing and pin assembly does not fall out of the
link. the final torque application will take place at a later step.
13
shOck link subassembly
place the shock Mount onto the lower
end of the shock as shown. slide the 8mm x31.75mm ti Female Bolt
and 8.5mmiD x 12.5mmoD washer through the shock mount and shock
eyelet.
14
stabilizinG link subassembly
place the 38802 2rs Max
Bearings into the stiff link h as shown. Make sure the extended race
of the bearings points inward. repeat on the opposing side
stabilizinG link subassembly
place the stiff link i between the
bearings. slide the 12mm x 42mm pivot pin through the bearings and
the stiff link i. screw the M5x.8x10 socket caphead mounting bolts into the
stiff link i, do not torque the bolts. the torque application will take place at
a later step.
shOck link subassembly
apply ti prep to the M6x1x12 ti Male
Bolt.
15
shOck link subassembly
attach the M6x1x12 ti Male Bolt and
6.5mmiD x 12.5mmoD washer to the female bolt and tighten using
two 5mm allen keys. Don not fully torque the complete torque will take
place at a later step.
16
ti PreP
Yeti recommends prepping all titanium threads with
ti prep.
11
12
9
10