background image

 

12 

CONTROL SEQUENCE 

 

A built-in microprocessor in the chiller-

heater  controls  the  external  pump 
demand  signals  in  response  to  the 
cooling and heating load.  The operating 
sequence  of  each  pump  and  the  cooling 
tower  fan  after  start-up,  during  normal 
operation,  and  after  a  normal  stop  or 
abnormal shut down is shown in Fig. 10.  
It is important that the chiller-heater have 
control  over  the  pumps  to  allow  for 

controlled  shut  down  under  normal  and 
abnormal conditions. 

Running  the  chilled  water  pump  at  all 

times is discouraged as the chiller-heater 
logic  will  expect  to  see  the  flow  switch 
open  when  the  “P”  dry  contacts  are 
opened.    If  it  does  not  open,  the  chiller 
assumes  the  flow  switch  has  failed  and 
will generate error code E016. 

 

 

 

Fig. 10 

– General Control Sequence

 

    CP = Cooling Water Pump Demand Relay 
    CTF = Cooling Tower Fan Demand Relay 
    P = Chilled/Hot Water Pump Demand Relay 

 

 
 

Summary of Contents for AROACE CH-MG150

Page 1: ...ty of this or any other equipment CONTENTS GENERAL Page ABSORPTION PRINCIPLE 2 COOLING OPERATION 3 HEATING OPERATION 4 CONTROLS GENERAL INFORMATION 5 CONTROL ADJUSTMENTS 8 CONTROL SEQUENCE 12 OPERATIO...

Page 2: ...ING INSTRUCTIONS may affect the equipment performance and product Warranty If the equipment does not operate as expected check the Troubleshooting Guide in these instructions BEFORE calling your Yazak...

Page 3: ...bundle The heat absorbed by the cooling water is rejected to a cooling tower or alternative system The liquid refrigerant that drips off the tubing bundle joins the liquid refrigerant that resulted f...

Page 4: ...ed refrigerant vapor and leaving a more concentrated solution The refrigerant vapor flows through a changeover valve into the Evaporator section The concentrated solution flows through another changeo...

Page 5: ...back to the same concentration level as when it started the cycle Absorber ABS Liquid refrigerant that condensed on the outer surface of the Evaporator tubing bundle drips into the Absorber sump Conce...

Page 6: ...ed manner by Building Automation Systems BAS BMS when Remote Operation is engaged Additional controls and interlocks may be required in some instances These controls and their functions can be explain...

Page 7: ...er has been set up at the factory and SHOULD NOT BE ADJUSTED Universal replacements are NOT recommended Only use OEM parts for the solution pump and controller Fig 5 Hitachi VFD Controller Control Pan...

Page 8: ...control box for troubleshooting observe all safety warnings on the chiller heater and in these instructions Only qualified and trained personnel should have access to the live electrical parts inside...

Page 9: ...tioned to the left whenever the unit is to be in normal operating condition Position this switch to the right when adjusting the burner Position this switch to the middle when the unit is to sit dorma...

Page 10: ...ard CAT5 cable one was provided from the factory connect the ACT5 to the Main CPU Board located in the upper right of the control box There is a jack in the upper middle of the CPU Board See Figure 8...

Page 11: ...board could result To engage Economy Mode close a circuit between TB1 75 and TB1 76 When that circuit is closed the Main CPU Board logic will automatically apply a modifier to the temperature set poi...

Page 12: ...tant that the chiller heater have control over the pumps to allow for controlled shut down under normal and abnormal conditions Running the chilled water pump at all times is discouraged as the chille...

Page 13: ...e Absorber and Condenser tubing bundles 4 When two or more absorption chiller heaters are installed in parallel set all units to the same operating mode HEATING 1 Select ON on the DIRECT OPERATION sec...

Page 14: ...epare the unit for long term shutdown Without running in Heat mode some water will be trapped in upper portions of the chiller heater and could potentially damage the unit should it freeze in the wint...

Page 15: ...lves are referred to as Service Valve A upper and Service Valve B lower Refer to Fig 4 for detail on where these valves are located at the front of the unit The evacuation service valves are back seat...

Page 16: ...well on a vessel as large as the chiller heater vacuum section Just because the vacuum pump has stopped producing bubbles in the water bucket does NOT mean the vacuum level is adequate A digital vacu...

Page 17: ...to help prevent potential tube damage during freezing conditions TROUBLESHOOTING SYMPTOM Chiller Heater does not operate Possible Cause REMEDY No High Voltage Check the LED for the Power indication o...

Page 18: ...umn An O mark indicates the potential issue should this line item go out of acceptable range 2 When water temperature rises above 104 F 40 C the tendency for corrosion rises remarkably As such there m...

Page 19: ...e GP sensor reads above 252 F 122 C in heating mode 27 Chilled water flow switch error Flow Switch FS1 is open when it should be closed 28 Cooling water flow switch error Optional cooling water Flow S...

Page 20: ...EMS INC 701 E PLANO PKWY SUITE 305 PLANO TEXAS 75074 6700 Phone 469 229 5443 Fax 469 229 5448 Email yazaki yazakienergy com Web www yazakienergy com This symbol on the product s nameplate means it is...