D
Checklist operation
Checklist
Run.
No.
Requirement
fulfilled
Notes
4
Operation
yes
no
4.1
Is it guaranteed that no changes are made to the system
configuration during operation of the safety PLC?
4.2
Is it guaranteed that before expanding the system,
removing individual system components and making
changes to the wiring, the control system is set to a safe
state dependent on the application by competent per-
sonnel?
4.3
Are the ambient conditions specified in the technical data
observed?
Chap. 2.6 ‘SDI 4xDC 24V - Technical data’ page 40
Chap. 2.10 ‘SDO 4xDC 24V 0.5A - Technical data’
4.4
Is it guaranteed that commissioning only takes place
after acclimatisation of the System SLIO safety modules?
Date: ......................... Name: ..................... .............. Signature: .................................. ....................