5 Installation Procedure
YASKAWA ELECTRIC
TOBP C730600 59A V1000 Option Modbus TCP/IP Installation Manual
EN 17
u
Prior to Installing the Option
Prior to installing the option, wire the drive, make necessary connections to the drive
terminals, and verify that the drive functions normally without the option installed. Refer to
the Quick Start Guide packaged with the drive for information on wiring and connecting the
drive.
u
Installing the Option
Refer to the instructions below to install the option.
DANGER!
Electrical Shock Hazard. Do not connect or disconnect wiring while the power is on. Failure to
comply could result in death or serious injury. Before installing the option, disconnect all power to the drive.
The internal capacitor remains charged even after the power supply is turned off. The charge indicator LED
will extinguish when the DC bus voltage is below 50 Vdc. To prevent electric shock, wait at least five minutes
after all indicators are off and measure the DC bus voltage level to confirm safe level.
1.
Shut off power to the drive, wait at least five minutes after confirming the DC bus
voltage is safe, then loosen the screw that fastens the front cover in place and
remove the front cover. This drive front cover will be replaced by the option cover.
Cover removal varies depending on drive size.
NOTICE:
Damage to Equipment. Observe proper electrostatic discharge procedures (ESD) when handling
the option, drive, and circuit boards. Failure to comply may result in ESD damage to circuitry.
Properly connect all pins and connectors.
Failure to comply may prevent proper operation and possibly damage equipment.
Check wiring to ensure that all connections are correct after installing the option
and connecting any other devices.
Failure to comply may result in damage to the option.
NOTICE