1 Outline
1-10
1.7
Inspection and Maintenance
This section describes the inspection and maintenance of SERVOPACK.
(1) SERVOPACK Inspection
For inspection and maintenance of the SERVOPACK, follow the inspection procedures in the following table
at least once every year. Other routine inspections are not required.
(2) SERVOPACK’s Parts Replacement Schedule
The electric or electronic parts are subject to deterioration over time. To avoid failure, replace these parts at
the frequency indicated.
Refer to the standard replacement period in the following table and contact your Yaskawa representative.
After an examination of the part in question, we will determine whether the parts should be replaced or not.
Note: If the above operating conditions are not used, replacement may be required sooner than the standard replacement
period. To extend the life of the parts, reduce the ambient temperature. Contact your Yaskawa representative if you
require more-detailed information.
Item
Frequency
Procedure
Comments
Exterior
At least once a year
Check for dust, dirt, and oil
on the surfaces.
Clean with compressed air.
Loose Screws
Check for loose connector
screws.
Tighten any loose screws.
The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the factory
settings before shipping. Be sure to confirm that the parameters are properly set before
starting operation.
Part
Standard Replacement
Period
Operating Conditions
Smoothing Capacitor
(Aluminum Electrolytic
Capacitor)
7 to 8 years
• Surrounding Air Temperature: Annual average of
30
°
C
• Load Factor: 80% max.
• Operation Rate: 20 hours/day max.