29
3/4"
(1,9 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
3/4"
(1,9 cm)
PARTS REQUIRED:
GABLE END WALL WITH DOOR
x86
2" (5,1 cm)
Place left
48" x 84"
panel onto wall frame flush to top of
Wall Frame
with primed side up as shown.
Use the gauge block to mark the 3/4" measurement on the wall stud.
Secure panel with two 2" nails 6" (15,2 cm) apart.
Repeat
STEP 4 to attach the right
48" x 84"
panel.
5
4
3/4" GAUGE
BLOCK
GAA
48 x 84"
(121,9 x 213,4 cm)
x1 LEFT + 1 RIGHT
Maintain
Flush
Maintain
Flush
Primed
side up
Primed
side up
Flush
Maintain 64" dimension
64"
(162,6 cm)
48"
(122 cm)
6"
(15,2 cm)
3/4"
(1,9 cm)
48"
(122 cm)
For squareness maintain flush
along panel edges.
3/4" GAUGE
BLOCK
3/4" GAUGE
BLOCK