72
PARTS REQUIRED:
LOFT
x4
2 x 4 x 96" (5,1 x 10,2 x 243,8 cm)
TP
x48
3" (7,6 cm)
2 x 4 x 48" (5,1 x 10,2 x 122 cm)
SP
x4
Orient parts
TP
and
SP
on a fl
at surface. Spread glue across
SP
and
TP
as shown.
Hold parts
TP
and
SP
flush and aligned
.
1-3/4"
(4,4 cm)
1-3/4"
(4,4 cm)
x2
Glue
SP
TP
TP
Flush
Flush
Flush
3" (7,6 cm)
Nails x12
SP
2
3
4
5
Assemble joist with 3" nails in a staggered pattern.
Turn assembled joist over and repeat staggered
nail pattern.
Repeat STEPS 1 - 3 to assemble one more loft joist
(Fig. A)
.
Support and drill a 7/16" hole through each end of each joist
(Fig. B)
.
BEGIN
¸
1
Fig. B
Fig. A
Flush
NOTE: Install the shelf and loft on the gable wall farthest from the door location.
Always install the shelf and loft on wall with SEVEN (7) studs.