40
PARTS REQUIRED (TEMPORARY):
First, nail lower edge of panel to fl oor frame using 2" nails 6" apart.
Angle nail to hit fl oor frame
(Fig. A)
.
3
You have fi nished standing your right eave wall.
FINISH
Secure eave wall bottom plates to fl oor using 3" nails
(Fig. A)
.
4
3" (7,6 cm)
x16
3" (7,6 cm)
x2
2" (5,1 cm)
x36
RIGHT EAVE WALL INSTALLATION
3" (7,6 cm)
Screws
OO
3" Nails into bottom plate
DOOR
BEGIN
Stand right sidewall on fl oor.
Center right side wall assembly on the 192" (487,7 cm) fl oor dimension.
Use
OO
as a temporary brace.
Secure with two 3" screws.
2
1
Nail 2" nails fi rst.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A
DOOR
DOOR
DOOR
6"
(15,2 cm)
OO
x1
1-1/2 x 2-1/2 x 69" (3,8 x 6,3 x 175,3 cm)
192"
(487,7 cm)