x6
1-1/2" (3,8 cm)
40
GABLE UNITS
PARTS REQUIRED:
x1
x1
Primed
side up
Primed
side up
1-3/4"
(4,4 cm)
2-9/16"
(6,5 cm)
1-3/4"
(4,4 cm)
1-1/2"
(3,8 cm)
Nails
1-1/2"
(3,8 cm)
Nails
XWA (on flat)
Orient parts on flat surface as shown.
Place left back gable panel as shown and secure using 1-1/2" nails as shown.
4
3
Place right back gable panel flush to left panel. Secure using 1-1/2" nails as shown.
You have finished assembling your gable units.
FINISH
Flush
x1
2 x 4 x 23-7/8" (5,1 x 10,2 x 60,6 cm)
XWA