![background image](http://html1.mh-extra.com/html/yardline/berkdale-14-x-8/berkdale-14-x-8_manual_3174629036.webp)
34
PARTS REQUIRED:
Nail lower edge of front wall panels to floor frame using 2" nails 6" apart.
Angle nail to hit floor frame
(Fig. D)
.
2
3
Secure front wall bottom plates to floor using 3" nails
(Fig. D)
.
Remove temporary support
PT
.
3" (7,6 cm)
x12
2" (5,1 cm)
x20
FRONT WALL
3" (7,6 cm)
Nails
You have finished standing your front wall.
FINISH
6"
(15,2 cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. D